Campbellfield, Victoria

The Problem


Barry Callebaut were looking for a reliable solution to improve their energy efficiency, reduce their electricity bills, become more environmentally responsible and bolster their sustainability positioning at its chocolate factory in Campbellfield. 

The Solution

After inspecting the site, conducting a feasibility study and calculation from historical electricity bills, Quality Energy recommended and installed a 568kW (total) solar PV system to generate clean, renewable energy, and manufactured and installed a 175kVAR Power Factor Correction Unit.

Benefits and Outcomes

Key equipment

  • 1369 x 415W Ulica Solar Panels
  • 5 x Sungrow Three Phase 110kW inverters

System size

568kW

Project warranty

  • 30-Year Solar Panel Product Warranty
  • 30-Year Solar Panel Performance Warranty
  • 20-Year Inverter Product Warranty
  • 10-Year Install Workmanship Warranty

Let's talk about your project

Contact us or call 1800 736 374 to talk about how we can help your business improve energy efficiency and reduce your energy cost.

Share by: